Latch-Up Testing Request Form:

To receive FREE Quotation for Latch-Up Testing Service, please using the online form below. 
Fields with this Mark (
*) are required. To help us better serve you, please provide a complete your requests of this Latch-up Testing Request. A Sales Technical will respond to you by email or phone within 24-hours.

* Company:
* Contact name:
* Telephone:
* Fax:
P.O. Number:
* E-mail:
* Address:
* City, State, Zip:
Part Number:
Pkg. Type:

PLEASE PROVIDE A PINOUT FOR THE DEVICE

Temperature at which devices should be tested ? Room Ambient and/or Maximum operating Temperature of
°C.


Negative Current Latch-up:

1. Voltage to which device should be powered V (Vddq)

2. Please provide a list of input pins with the state (High or Low) they should be set to


3. Does the device require preconditioning, for example after power-up?
Yes  No
If YES, please describe in detail how the preconditioning should be performed.

4. What value of Icc, the total dc supply current for the DUT, will be obtained if the device is setup correctly?
mA (I nom)

5. What value of Icc will be defined as latch-upmA
      (JEDEC 78 recommends I nom + 10 mA, or 1.4X I nom, whichever is greater.)

6. What value should VddQ be raised to during test?
mA

7. The starting trigger current required is
mA, incrementing inmA steps to a maximum current ofmA. The trigger voltage should be limited toV. The duration of the trigger voltage should bems (JEDEC 78 recommends 10 µs to 5s). The wait time before Icc will be measured is (JEDEC 78 recommends 3ms to 5s)


Positive Current Latch-up:
 

(Complete Only if conditions are different to Negative Current Latch-up)

1.
Voltage to which device should be powered
V (Vddq)

2. Please provide a list of input pins with the state (High or Low) they should be set to


3.
Does the device require preconditioning, for example after power-up?
Yes  No
If YES, please describe in detail how the preconditioning should be performed.

4.
What value of Icc, the total dc supply current for the DUT, will be obtained if the device is setup correctly?
mA (I nom)

5.
What value of Icc will be defined as latch-up
mA
      (JEDEC 78 recommends I nom + 10 mA, or 1.4X I nom, whichever is greater.)

6.
What value should VddQ be raised to during test?
(Vtest)

7.
The starting trigger current required is
mA, incrementing inmA steps to a maximum current ofmA. The trigger voltage should be limited toV. 
    The duration of the trigger voltage should be
ms (JEDEC 78 recommends 10 µs to 5s). 
    The wait time before Icc will be measured is
(JEDEC 78 recommends 3ms to 5s)


Supply Over-Voltage Test:

1.
Voltage to which device should be powered
V (Vddq)

2.
Please provide a list of input pins with the state (High or Low) they should be set to


3.
Does the device require preconditioning, for example after power-up?
Yes  No
If YES, please describe in detail how the preconditioning should be performed.

4.
The starting trigger current required is
mA, incrementing inmA steps to a maximum current ofmA. The trigger voltage should be limited toV. 
    The duration of the trigger voltage should be
ms (JEDEC 78 recommends 10 µs to 5s). 
    The wait time before Icc will be measured is
(JEDEC 78 recommends 3ms to 5s)


Additional Information:



Your submission will be emailed to sales@icenginc.com

Innovative Circuits Engineering, Inc. is committed to providing our
customers services and products with highest quality and on time delivery.


© 1991-2001 Innovative Circuits Engineering, Inc. All Rights Reserved.
Website Designed By
VietNetCenter.com